- SPE Energy Stream
- Getting to Sanction in 3 Months — Engineering Perspective
Getting to Sanction in 3 Months — Engineering Perspective
Add to Cart
Course Credit: 0.1 CEU, 1 PDH
The discussion will be a case study of design simplifications for a subsea tie-back (including flow assurance FEED) to enable investment decision in 3 months. Simplifications included design to mitigate asphaltene and hydrate challenges along with a long tie-back in deepwater GoM. An integrated team including subsurface, facilities and flow assurance enabled the decision with partner approval for a brownfield tie-back. All content contained within this webinar is copyrighted by Nikhil Joshi and its use and/or reproduction outside the portal requires express permission from Nikhil Joshi.
Post Tags
1 chapter
1 downloadable resource
Course Chapters
- 1Getting to Sanction in 3 Months — Engineering Perspective - Chapter 1Media Type: Video
Credits
Earn credits by completing this course0.1 CEU credit1 PDH creditSpeakers